Displacement piles

With the help of vibro hammer a steel pipe is advanced into the ground with the bottom of it being left in the ground. After the pipe reaches the required depth, a reinforcement cage is lowered into the pipe which is filled with concrete, afterwards using the vibro hammer the...


(LT) Spraudai – įlaidinės plastiko membranos

Sorry, this entry is only available in Lithuanian.


(LT) CFA grąžtai

Sorry, this entry is only available in Lithuanian.


(LT) Mikropoliai

Sorry, this entry is only available in Lithuanian.


Drilling piles

To install these piles few different methods are applied. Our company uses KELLY and CFA methods for the drilling piles installation. KELLY METHOD Using this method for the piles installation the drilling machines are used, in which the so-called KELLY equipment is mounted, consisting of a Kelly bar and a...


Piling walls

Piling walls are installed out of steel or plastic planks, when the installation of the temporary or permanent wall is needed, for example, in order to protect the site from the ground water, landslides, etc. For the installation of the piling walls vibro hammers are used, which are mounted on...


Anchors

Anchors are installed in order to keep the bearing walls stable, in case the ground pressure exceeds the allowed loading of the bearing walls.

Anchors are normally installed by the drilling of a steel anchor (a bar or a pipe) through the bearing wall at an angle and at a required distance. The bar drilled inside is fixed in the ground using cement grout.